Eutraco

Willebroek


Eutraco was founded in 1967 in Roeselare as a transport company and has since grown into a leading player in sustainable and innovative logistics. With multiple sites across Belgium and an extensive fleet, the company now offers end-to-end logistics solutions to customers both nationally and internationally.

Powerland is supporting Eutraco in the electrification of several of its sites. In Willebroek, we delivered a high-performance combination of DC fast charging and battery storage, tailored to the energy profile of a modern logistics hub.

The installation includes:

  • several high-power DC fast chargers (400 kW total) controlled by an intelligent satellite-based system
  • liquid-cooled battery systems with a total storage capacity of 1.63 MWh and a power output of 700 kW
  • full integration with the existing infrastructure, including groundwork, cabling, and grid upgrades

Thanks to this solution, Eutraco now has the flexibility to absorb peak consumption, reduce energy costs, and efficiently manage the charging process.

Ready to take the next step towards sustainable logistics? Powerland delivers the complete package – from analysis and design to delivery, installation, and all supporting site works.


Eutraco

Willebroek


Eutraco was founded in 1967 in Roeselare as a transport company and has since grown into a leading player in sustainable and innovative logistics. With multiple sites across Belgium and an extensive fleet, the company now offers end-to-end logistics solutions to customers both nationally and internationally.

Powerland is supporting Eutraco in the electrification of several of its sites. In Willebroek, we delivered a high-performance combination of DC fast charging and battery storage, tailored to the energy profile of a modern logistics hub.

The installation includes:

  • several high-power DC fast chargers (400 kW total) controlled by an intelligent satellite-based system
  • liquid-cooled battery systems with a total storage capacity of 1.63 MWh and a power output of 700 kW
  • full integration with the existing infrastructure, including groundwork, cabling, and grid upgrades

Thanks to this solution, Eutraco now has the flexibility to absorb peak consumption, reduce energy costs, and efficiently manage the charging process.

Ready to take the next step towards sustainable logistics? Powerland delivers the complete package – from analysis and design to delivery, installation, and all supporting site works.