Retail parking Naninne
Naninne
In Naninne (Wierde), Wallonia, Powerland has completed a new charging station with 30 charging points on a retail parking lot along the regional road. This charging station is equipped with three Alpitronic HYC 150 DC hyperchargers and 24 Etrel AC chargers of 22 kW, providing a comprehensive and reliable charging solution.
To reduce the load on the grid and limit peak demands, we have implemented smart energy management systems, such as dynamic load balancing, priority charging, and peak shaving. Additionally, 1200 solar panels with a capacity of 440 kVA are connected, sustainably generating a large portion of the required energy. Soon, a nearly 500 kWh battery storage system will also be installed to optimize energy storage.
With this project, Naninne (Wallonia) is becoming a frontrunner in the transition to clean energy and emission-free mobility.
Retail parking Naninne
Naninne
In Naninne (Wierde), Wallonia, Powerland has completed a new charging station with 30 charging points on a retail parking lot along the regional road. This charging station is equipped with three Alpitronic HYC 150 DC hyperchargers and 24 Etrel AC chargers of 22 kW, providing a comprehensive and reliable charging solution.
To reduce the load on the grid and limit peak demands, we have implemented smart energy management systems, such as dynamic load balancing, priority charging, and peak shaving. Additionally, 1200 solar panels with a capacity of 440 kVA are connected, sustainably generating a large portion of the required energy. Soon, a nearly 500 kWh battery storage system will also be installed to optimize energy storage.
With this project, Naninne (Wallonia) is becoming a frontrunner in the transition to clean energy and emission-free mobility.

