Skip to content

We value your privacy

We use cookies to optimize the functionality of the website and to provide you with the best possible experience. Click on “Accept cookies” to accept all cookies or set your own preferences. Read more about our cookie policy.

Your preferences

Safe, robust and AREI-compliant electrical installations for business premises, charging plazas and industrial sites.

 

Schedule a technical consultation

Electrotechnics for charging infrastructure and business installations

Every charging station, battery, PV installation or EMS starts with a solid electrical foundation. Powerland designs, builds and inspects electrotechnical installations that distribute your power reliably and are ready for growth.

Electrical challenges? We deliver stability.

Challenges

  • Insufficient capacity for charging points
  • Outdated distribution boardsn
  • Unclear cable sections and protection
  • Risk of peak loads from new consumers
  • Complex cabling in existing buildings
  • Uncertainty about inspection and compliance (AREI)

Solutions

  • Correct dimensioning of cables and power capacity
  • Upgrade or expansion of distribution boards
  • Integration with EMS for smart control
  • Low and medium voltage solutions
  • Full AREI-compliant installation and inspection
  • Safe preparation for charging plazas and energy projects

From distribution boards to connections: your electrical backbone

Low voltage installations

Low voltage installations

  • Cable dimensioning
  • Fuses and protections
  • Connections to charging points and building
Medium voltage connections

Medium voltage connections

  • New transformer cabins
  • Adapting metering cells and transformation in existing cabins
  • Larger charging plazas with separate metering cabin and transformer cabin
Verdeelborden en bordenbouw

Distribution boards and panel construction

  • New switchboards
  • Modification of existing distribution boards
  • Power distribution ready for future consumption
  • Grid disconnection panels
  • Remote control

Cabling that is ready for today and tomorrow

Cable routes and connections

  • Correct cable sections per charging point
  • Underground and above-ground routes
  • Protection against moisture, heat and mechanical damage
  • Integration via conduit, cable tray or trench
  • Connections to AC and DC charging stations

Connection capacity and protection

  • Analysis of available capacity
  • Load balancing between charging points
  • Overload protection
  • Smart power distribution via EMS
Contact us
Beschrijving

Dimensioned for today's capacity, with reserve capacity for tomorrow's expansion.

How does the electrotechnics installation process work?

Analysis & dimensioning

Mapping the installation, consumption and growth plans.

Design & engineering

Determining cable sections, protections and panel modifications.

Execution & connection

Installation and connection by certified technicians.

Configuration & inspection

Testing, labelling and AREI-compliant inspection.

 

Handover & monitoring

Diagrams, certificates and connection to EMS or charge management.

 

From the first power analysis to the final AREI inspection: Powerland guides every electrotechnical project throughout Belgium. You receive a complete handover file with single-line diagrams, layout diagrams, cable and protection calculations and inspection certificates — aligned with insurance requirements and, if desired, linked to your energy management system.

Plan your installation project

Questions about
electrical engineering

A grid study is a technical assessment by Fluvius to determine whether your installation can be safely and compliantly connected to the distribution grid (including voltage quality, protections, grid capacity).

Since the beginning of 2024, a grid study is only mandatory from 25 kVA (previously from 10 kVA). Up to and including 25 kVA you do not need to request a grid study.

No grid study needed up to 25 kVA (small production installation)

With Fluvius, no grid study is needed as long as the total AC inverter capacity of your entire installation (sum of all inverters: PV, battery/hybrid, V2G, ...) is a maximum of 25 kVA.

Grid study for installations above 25 kVA

From more than 25 kVA you fall under "large production installations" and you must request a grid study. Fluvius requests among other things EAN code, type/capacity of the inverters and (if applicable) a single-line diagram of the customer cabin.

Accelerated grid study (25 to 56 kVA)

For files with a total inverter capacity of 25 to 56 kVA, an accelerated grid study is often used: you quickly receive (free) feedback on whether a detailed (paid) study is needed.

Full (paid) grid study (above 56 kVA)

Above 56 kVA, a full and paid study is usually required before connection.

 

Additional technical thresholds you should know

> 30 kVA: additional grid disconnection / interface protection

At > 30 kVA, an additional grid disconnection / interface protection is usually required to ensure safe parallel operation with the distribution grid, according to Synergrid C10/11 and Fluvius connection conditions.

Phase distribution and limits per connection (single-phase / three-phase)

In terms of phase distribution, limits also apply: on a single-phase connection, a maximum of 5 kVA inverter capacity may be installed. A three-phase inverter may be connected up to 10 kVA without grid study.

Only if your current board has insufficient capacity or protections. Otherwise we expand purposefully.

To all questions  

Contact and help

Our customer service and sales team are ready to assist you.
If you are at a charging point and require immediate assistance, you can reach us at +32 57 69 01 05 to speak to an employee.
For non-urgent questions regarding billing or your account, you can email info@powerland.be

Get in touch