A public charging park at the roadside of a company, for drivers passing through and for the people who work there.

Project · Anzegem

Public charging at Building Windows

A public charging site on the street side of a business, for drivers passing through and the people who work there.

Location
Anzegem
Type
Business site

Commissioning

2021

Early December

Fast charger replacement

2023

May

Fast charger

HYC300

Alpitronic

Charging cables

2 × 400 A

On the HYC300

Building Windows, a company specialising in aluminium and PVC systems in Anzegem, had a public charging site installed along the street side of its premises in 2021. Anyone passing by can charge there, as can the company’s own staff. Powerland carried out the entire installation, from the high-voltage substation to commissioning.

In October and November 2021, our teams laid cables and spare ducts, pulled data cables and fibre optics for communication, and poured the concrete bases. Three new power circuit breakers and six additional protective devices for the chargers were installed in the substation. By early December 2021, the chargers were ready, connected to our My.Powerland management platform, with dynamic load balancing to distribute the available current fairly.

In May 2023, an Alpitronic HYC300 with two 400 A charging cables replaced the first fast charger on the site.

What made the difference?

  • One partner. From pulling cables to inspection, with our own teams.
  • A substation that grew with the site. Additional outgoing circuits for the chargers were added to the substation.
  • Dynamic load management. Multiple chargers, one connection, no overload.
  • Management after handover. Chargers, sessions and billing are managed through My.Powerland.

Work delivered

2021

  • Cable and ducting works, data cables and fibre optics
  • Concrete bases and cast-in cover
  • Modifications to the high-voltage substation
  • Efacec HV350 ultrafast charger and AC chargers with a bank card payment terminal
  • Dynamic load balancing
  • Inspection and commissioning

2023

  • Alpitronic HYC300 with two 400 A cables

Will your customers soon be charging at your business? Plan a no-obligation conversation with our charging experts.

Delivered by Powerland
  • DC fast charger

Contact and help

Our customer service and sales team are ready to assist you.
If you are at a charging point and require immediate assistance, you can reach us at +32 57 69 01 05 to speak to an employee.
For non-urgent questions regarding billing or your account, you can email info@powerland.be

Get in touch