We zochten een partner die ons de weg wees in EV-laden. We vonden een team waar we blind op vertrouwen.
— Tom GhesquièreLaadpunt Ghesquière
Ardooie
From fuel to charging infrastructure
How Tom Ghesquière made the complete transition from fossil fuels to a future-ready charging station, with Powerland as his full-service partner.
Key figures and features
Energy is in the family’s DNA
Energy has long been part of the Ghesquière family story. Tom’s grandfather Roger was a well-known fuel and coal merchant at the Kaaie in Ardooie. His father Johan continued the business and expanded it with diesel and petrol pumps. Now, in the third generation, Tom is writing a new chapter: the same ambition, with a new direction.
The energy market is changing fundamentally. Tom saw where things were heading and chose to sell the fuel business and move into charging infrastructure. It was a complete transition, not a half measure.
The challenge: learning a new trade
Tom knew the fuel business inside out, but charging infrastructure was new territory: power management, grid capacity, charging protocols, and AC and DC technology. He needed a partner who could manage the entire process. Not just a hardware supplier, but a guide from the first advice through to an operational charging station.
Why Powerland?
Trust did not start with a quote. Tom had known Vandotec for years as a reliable partner: Vandotec had previously installed his fuel depot. A long-standing specialist in fossil-fuel infrastructure and Powerland’s parent company, Vandotec established Powerland as a specialised division for charging infrastructure, battery storage and solar panels. The same reliability and delivery experience now support new energy solutions.
A visit to an existing Powerland customer confirmed Tom’s choice. The message was clear: if they had to choose again, they would choose Powerland.
The deciding factors were technical expertise, a personal approach and complete support: from advice and engineering to installation, subsidy applications and a user-friendly charging platform.
“They take care of everything from A to Z, and their team is ready to roll up its sleeves. The project was managed down to the last detail.”
— Tom Ghesquière, owner of Laadpunt Ghesquière
The project: a complete charging station
On the Roeselaarsestraat, near the R32 route and the E403 junctions, Powerland built a charging station with options for different dwell times and vehicle types.
DC fast-charging stations
Four DC fast-charging stations provide charging capacity of up to 300 kW. Eight vehicles can charge at the same time.
AC charge points
Ten 22 kW AC charge points are located at the e-carpool parking area, for vehicles parked for longer.
Solar panels on the canopy
The panels generate some of the electricity used by the chargers themselves, another step towards energy neutrality.
EV car-share parking
The parking area has space for shared cars and shared bikes.
Vending shop
Farm products from local suppliers are available around the clock, seven days a week.
bpost parcel locker
According to the project information provided, delivery via the parcel locker reduces CO₂ emissions per parcel by 30% compared with home delivery.
What made the difference?
End-to-end support
Tom did not have to work through power management, grid connections or charging protocols on his own. Powerland turned the technical complexity into clear choices.
Structure and follow-up
A dedicated contact, clear planning and proactive communication kept the project on track.
Help with subsidies
Powerland guided the subsidy application and took care of that part of the process too.
Quality infrastructure
The result is a well-finished charging station with high-quality DC and AC equipment.
A charging platform ready for the future
The user-friendly, accessible platform can scale as the site grows.
An in-house team, direct contact
A hands-on team and personal contact, without a call centre.
Reassuring. With professional guidance and clear project management, everything ran smoothly.