Quote

A three-phase build-up from a reinforced high-voltage cabin to a public DC fast charger.

400 kVA high-voltage cabin · Etrel AC chargers 22 kW · Alpitronic DC fast charger 50 kW · Load balancing · My.Powerland CPO management

Project · Porsche Centre

Charging infrastructure at Geeraerd Porsche Centre

Geeraerd Porsche Centre is the official Porsche dealership for Knokke-Heist and the surrounding area, located on Natiënlaan. Powerland first upgraded the high-voltage substation, then expanded the AC and DC charging infrastructure in phases.

Customer
Geeraerd Porsche Centre
Location
Natiënlaan · Knokke-Heist
Sector
Car dealership
Installation
Upgraded substation, AC and DC chargers

Grid capacity first, followed by a phased expansion of the charging infrastructure.

Project overview

Start with the installation’s foundation

As with many premium car dealerships, the vehicle fleet and customer offering at Geeraerd Porsche Centre are electrifying quickly. This calls for electrical infrastructure that can keep pace.

Powerland therefore started in 2021 by addressing grid capacity, not by installing charging points. After approval from the grid operator, the existing high-voltage substation was upgraded to 400 kVA. The work included a new oil-cooled Siemens transformer, a new high-voltage metering cubicle and a fully renewed low-voltage distribution system. This upgrade laid the foundation for additional charging capacity on site.

The charging infrastructure followed in phases: first Etrel AC charging points with load balancing, later supplemented by a publicly accessible Alpitronic DC fast charger. All AC and DC charging points are connected to the My.Powerland CPO platform.

The installation in detail

High-voltage substation upgrade

Upgraded to 400 kVA with a new oil-cooled Siemens transformer, a new high-voltage metering cubicle and a renewed low-voltage distribution system. The work was carried out after approval from the grid operator.

AC charging infrastructure

Etrel 22 kW charging points with load balancing, expanded in two phases.

DC fast charger

A publicly accessible 50 kW Alpitronic HYC fast charger with a CCS Combo 2 connector.

Centralised management

All charging points are connected to the My.Powerland CPO platform for centralised billing, roaming and management.

What made the difference?

By addressing the grid before installing chargers, Geeraerd Porsche Centre avoided a common pitfall: ordering charging points and then finding out that the existing connection could not supply the required power. The 2021 substation upgrade created room to add AC and DC charging capacity in several phases, without repeatedly running into grid constraints.

Delivered by Powerland
  • DC fast charger
  • AC charging station
Porsche Center
Porsche Center
Porsche Center
Porsche Center +1

Contact and help

Our customer service and sales team are ready to assist you.
If you are at a charging point and require immediate assistance, you can reach us at +32 57 69 01 05 to speak to an employee.
For non-urgent questions regarding billing or your account, you can email info@powerland.be

Get in touch