From a first charge point to nine sites: AC and DC, built out phase by phase.
9 sites · 2020–2025 · AC and DC · 1 platform (My.Powerland)
We use cookies to optimize the functionality of the website and to provide you with the best possible experience. Click on “Accept cookies” to accept all cookies or set your own preferences. Read more about our cookie policy.
From a first charge point to nine sites: AC and DC, built out phase by phase.
9 sites · 2020–2025 · AC and DC · 1 platform (My.Powerland)
Every site has its own grid connection, its own parking layout and its own demand. On some sites one or two AC charge points were enough; on others, several charge points and a DC fast charger were needed. A standard package for all sites would not have worked, so each location was sized individually.
Need a charging solution for your own sites? Get in touch with Powerland.
Our customer service and sales team are ready to assist you.
If you are at a charging point and require immediate assistance, you can reach us at +32 57 69 01 05 to speak to an employee.
For non-urgent questions regarding billing or your account, you can email info@powerland.be